PTT Fifth Transmission 5 th’GAS Pipeline Project Phase 2

Project Description of Phase 2

 - Building Twelve (12)  Block Valve Stations BVS 5.9 to BVS 5.20.

 - Building WNMR includes a filtering station, metering station, flow/pressure control station, over pressure protection system, sales taps and a tie-in to the existing Wang Noi compressor station mixing header.

- Building RA6MXS includes a Pig Receiver Station, filtering station, metering station, flow / pressure control station, mixing station (IGMS), mixing header, sales taps, and tie-ins to existing facilities as referred above.

Client:

PTT Public Company Limited

Consultant:

PTT Public Company Limited

Contractor:

Joint Venture IBCI – McTRIC

Main Contractor:

JSC OGCC KazStroyService

Contract Period:

May 2018 - May 2021

Scope of Work:
  • EPC Engineering
  • Procurement and Construction