Project Description of Phase 2
- Building Twelve (12) Block Valve Stations BVS 5.9 to BVS 5.20.
- Building WNMR includes a filtering station, metering station, flow/pressure control station, over pressure protection system, sales taps and a tie-in to the existing Wang Noi compressor station mixing header.
- Building RA6MXS includes a Pig Receiver Station, filtering station, metering station, flow / pressure control station, mixing station (IGMS), mixing header, sales taps, and tie-ins to existing facilities as referred above.
PTT Public Company Limited
PTT Public Company Limited
Joint Venture IBCI – McTRIC
JSC OGCC KazStroyService
May 2018 - May 2021